Bulgarcom
 
БългарскиDeutsch
   
    Home E-mail Print  
Floor formwork
Кофраж за плоча Floor formwork system with Н20 beams
Versatile formwork system for floor slabs of any thickness, height and shape.
Кофраж с падащи глави Alumecano Alumecano Mix floor formwork system with drop heads
Floor formwork system with drop heads and H20 beams for fast implementation of flat floors.
Three days after pouring concrete the 80% of the components can be recovered and used for the next slab. The formwork system is specially projected to be compatible with the commonly used in Bulgaria H20 beams and 21 mm formwork panels (film-faced plywood and 3-S wooden boards).
Кофраж с падащи глави Alumecano Mix Alumecano floor formwork system with dropping heads
Floor formwork system with drop heads for fast implementation of flat floors.
Alumecano formwork system consists of 3 elements - main girder, support girder and drop head. The system is with minimum weight, projected for fast assembling/dismantling, highly efficient and compatible with 21 mm formwork panels (film-faced plywood and 3-S wooden boards).
Подпорни кули Load-bearing towers
Load-bearing towers for implementation of slabs, bridges, tunnels and other projects that require greater working height and loading capacity of the formwork.